Impact rolling
A towed polygonal roller travels across a planned route and transfers repeated loading through its rolling action.
Impact compaction explained
Impact compaction is a general term for methods that transfer repeated dynamic loading into the ground through impact equipment. The relevant CMG equipment discussion starts with material, work area, access, available power unit and acceptance requirements.
This page explains the terminology without turning a method description into a universal performance claim.
Ask about this topic
Guide contents
A towed polygonal roller travels across a planned route and transfers repeated loading through its rolling action.
RIC uses a hydraulic impact arrangement and is reviewed with carrier, work-zone and access requirements.
Method choice depends on ground information, project objective, available equipment and the following construction activity.
Machine activity supports the work history; project-defined inspection or testing determines acceptance.

Evidence boundary
CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.
Buyer checklist
Decision record
Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.
Related equipment
High-energy polygonal roller for demanding subgrade and ground improvement projects.
Explore
A high-energy impact roller for embankment, subgrade and foundation treatment.
Explore
Balanced high-energy compaction for road base, fill and infrastructure construction.
Explore
Video centre
Review available CMG equipment footage, then bring your project inputs to the technical discussion.
Visit the CMG video centreResource FAQ
A category of ground-treatment methods that use repeated impact loading to densify or improve ground under project controls.
No. Suitability depends on the actual ground, work area, access and project acceptance requirements.
Material, moisture, work area, access, available equipment and acceptance route.
Only the project specification and acceptance process can establish the required outcome.