Working arrangement
RIC uses a hydraulic impact arrangement with a contact foot; dynamic compaction uses a project-designed drop-impact method.
RIC comparison guide
Rapid Impact Compaction and dynamic compaction are different planned methods. The comparison should focus on work area, access, equipment interface and project controls.
This guide uses the keyword discussion to prepare a technical RFQ without ranking one method as universally better.
Ask about this topic
Guide contents
RIC uses a hydraulic impact arrangement with a contact foot; dynamic compaction uses a project-designed drop-impact method.
RIC may be reviewed where a smaller working arrangement or constrained access is relevant; the final method depends on the site.
RIC systems can support process records, while dynamic compaction requires its own project-specific controls and verification.
Ground investigation, site constraints and responsible engineering control the method choice.

Evidence boundary
CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.
Buyer checklist
Decision record
Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.
Related equipment
High-energy polygonal roller for demanding subgrade and ground improvement projects.
Explore
A high-energy impact roller for embankment, subgrade and foundation treatment.
Explore
Balanced high-energy compaction for road base, fill and infrastructure construction.
Explore
Video centre
Review available CMG equipment footage, then bring your project inputs to the technical discussion.
Visit the CMG video centreResource FAQ
Their working arrangements, equipment interface and project controls differ.
It may be assessed where access is constrained, but carrier reach and safe operating space must be confirmed.
No. Monitoring supports process records; acceptance follows the project specification.
Site area, access, controls, monitoring needs and acceptance route.