Technical resources

RIC for Backfill & Reclamation

Backfill and reclamation RIC guide

Use this guide to make the project discussion more precise.

RIC may be considered for backfill or reclaimed-land work where material type, placement history, water condition and project acceptance can be documented.

This guide connects the keyword to a structured RFQ for granular fill and reclamation projects.

Ask about this topic
RIC for Backfill & Reclamation

Guide contents

Questions a technical buyer should resolve before selection.

01

Material context

Describe fill source, grading, moisture, placement history and following construction activity.

02

Work area

Define zones, access, water or logistics interfaces and equipment movement plan.

03

Equipment route

Review RIC attachment or hydraulic compaction configuration with carrier and site requirements.

04

Verification

Project inspection or testing determines acceptance and release.

CMG technical resource and equipment selection guide

Evidence boundary

A useful guide is clear about what it does not prove.

CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.

  • Do not treat all reclaimed fill as the same.
  • Do not infer a universal treatment depth.
  • Review water, settlement or access changes with the responsible team.

Buyer checklist

Prepare these inputs before sending an RFQ.

  1. Fill source and material history
  2. Work zones and access
  3. Water or settlement constraints
  4. Available carrier equipment
  5. Acceptance and programme requirements

Decision record

Turn the research question into a reviewable equipment brief.

Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.

01

Inputs to evidence

  • Fill source and material history
  • Work zones and access
  • Water or settlement constraints
  • Available carrier equipment
02

Decision to make

  • Material context
  • Work area
  • Equipment route
03

Documents to request

  • Source-matched model specification and configuration
  • Operating and maintenance guidance for the quoted scope
  • Project-specific verification and handover requirements

Related equipment

Move from the question to a CMG equipment review.

CMG compaction equipment video centre

Video centre

Use video as context, not as unsupported proof.

Review available CMG equipment footage, then bring your project inputs to the technical discussion.

Visit the CMG video centre

Resource FAQ

Further questions for the project team.

Can RIC be used for reclamation?

It may be assessed where material, access and acceptance requirements can be documented.

What reclamation information is needed?

Fill source, material, moisture, work area, access and acceptance route.

Which carrier is suitable?

The carrier is selected from site access, available equipment and project requirements.

How is reclaimed land released?

Through the project-defined inspection or testing process.

Project RFQ

Tell us what the ground needs.

Share the project conditions and the CMG team can discuss a suitable equipment route.