Material context
Describe fill source, grading, moisture, placement history and following construction activity.
Backfill and reclamation RIC guide
RIC may be considered for backfill or reclaimed-land work where material type, placement history, water condition and project acceptance can be documented.
This guide connects the keyword to a structured RFQ for granular fill and reclamation projects.
Ask about this topic
Guide contents
Describe fill source, grading, moisture, placement history and following construction activity.
Define zones, access, water or logistics interfaces and equipment movement plan.
Review RIC attachment or hydraulic compaction configuration with carrier and site requirements.
Project inspection or testing determines acceptance and release.

Evidence boundary
CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.
Buyer checklist
Decision record
Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.
Related equipment
High-energy polygonal roller for demanding subgrade and ground improvement projects.
Explore
A high-energy impact roller for embankment, subgrade and foundation treatment.
Explore
Balanced high-energy compaction for road base, fill and infrastructure construction.
Explore
Video centre
Review available CMG equipment footage, then bring your project inputs to the technical discussion.
Visit the CMG video centreResource FAQ
It may be assessed where material, access and acceptance requirements can be documented.
Fill source, material, moisture, work area, access and acceptance route.
The carrier is selected from site access, available equipment and project requirements.
Through the project-defined inspection or testing process.