Impact rolling is a mobile towable system moving across a planned route. Dynamic compaction is a project-designed drop-impact method with its own set-out, exclusion and control requirements.
Method comparison guide
Impact rolling and dynamic compaction are different planned methods. The relevant comparison is not a universal performance ranking; it is whether the project work area, access, safety controls, construction interface and acceptance route fit the proposed method.
Use this page to identify the inputs needed for a preliminary CMG equipment discussion. Method design and acceptance remain with the responsible project team.
Ask about this topic
Guide contents
Impact rolling is a mobile towable system moving across a planned route. Dynamic compaction is a project-designed drop-impact method with its own set-out, exclusion and control requirements.
Both methods require coordination with access, adjacent works, utilities, water conditions and following construction activities.
The work plan should identify zones, controls, monitoring or records and the project-defined acceptance path.
No universal treatment result is implied by choosing either method. Actual ground information and project engineering review control the choice.

Evidence boundary
CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.
Buyer checklist
Decision record
Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.
Related equipment
High-energy polygonal roller for demanding subgrade and ground improvement projects.
Explore
A high-energy impact roller for embankment, subgrade and foundation treatment.
Explore
Balanced high-energy compaction for road base, fill and infrastructure construction.
Explore
Video centre
Review available CMG equipment footage, then bring your project inputs to the technical discussion.
Visit the CMG video centreResource FAQ
No. They use different working arrangements and require different project planning and control approaches.
CMG can discuss equipment routes; final method design and acceptance belong to the responsible project engineering process.
Compare site area, access, exclusion requirements, ground information, programme and verification route.
A video can show equipment context but does not establish suitability or project acceptance.