Compatibility inputs
Loader type, available drawbar capability, roller configuration and site conditions must be reviewed together.
ZL50 loader compatibility guide
A ZL50 loader may be considered as a tow unit only after the project confirms roller mass, travel speed, towing connection, site gradient and operating controls.
This guide helps a buyer request the correct compatibility information from CMG.
Ask about this topic
Guide contents
Loader type, available drawbar capability, roller configuration and site conditions must be reviewed together.
Available CMG impact roller manual guidance states recommended operation of 10-15 km/h and avoidance of sharp or high-speed turns.
Turning space, gradient, ground condition and access affect whether the combination can operate safely.
The RFQ should state whether the enquiry covers roller only, tow arrangement, monitoring or support equipment.

Evidence boundary
CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.
Buyer checklist
Decision record
Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.
Related equipment
High-energy polygonal roller for demanding subgrade and ground improvement projects.
Explore
A high-energy impact roller for embankment, subgrade and foundation treatment.
Explore
Balanced high-energy compaction for road base, fill and infrastructure construction.
Explore
Video centre
Review available CMG equipment footage, then bring your project inputs to the technical discussion.
Visit the CMG video centreResource FAQ
No. Roller configuration, loader capability and site conditions must be reviewed together.
The available CMG impact roller manual guidance states 10-15 km/h for relevant operation.
Make, model, available towing connection and any site operating limits.
Through CMG configuration review using the RFQ inputs and project conditions.