Structure context
Define foundation type, load, allowable settlement and following construction activity.
Foundation settlement planning
Foundation settlement control begins with the structure load, ground investigation and required performance before an equipment route is selected.
CMG equipment discussion supports the planning conversation; it does not replace foundation design or acceptance.
Ask about this topic
Guide contents
Define foundation type, load, allowable settlement and following construction activity.
Review ground information and compare impact, hydraulic or other project-selected ground-treatment routes.
Process monitoring can document work; project testing determines acceptance.
The treated area is released only after the project-defined inspection or testing route.

Evidence boundary
CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.
Buyer checklist
Decision record
Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.
Related equipment
High-energy polygonal roller for demanding subgrade and ground improvement projects.
Explore
A high-energy impact roller for embankment, subgrade and foundation treatment.
Explore
Balanced high-energy compaction for road base, fill and infrastructure construction.
Explore
Video centre
Review available CMG equipment footage, then bring your project inputs to the technical discussion.
Visit the CMG video centreResource FAQ
No. Foundation performance depends on project design, ground conditions and acceptance.
Impact roller or hydraulic compaction routes can be discussed after project inputs are reviewed.
Structure, foundation, ground information, work area, access and acceptance requirements.
By the responsible foundation engineering process.