Technical resources

CMG Video Centre

CMG video and media centre

Use this guide to make the project discussion more precise.

Video is useful for understanding equipment form, working context and product range, but it does not replace technical documentation or project-specific acceptance.

Use the official CMG video centre as a research entry point, then bring project inputs to the RFQ discussion.

Ask about this topic
CMG Video Centre

Guide contents

Questions a technical buyer should resolve before selection.

01

Product context

Video can show roller geometry, tow arrangement, hydraulic equipment and operating environment.

02

Application context

Available media helps buyers understand how equipment may be considered for roads, rail, airports, dams and industrial work.

03

Evidence boundary

Video material supports product research; it is not proof of a treatment result or final machine configuration.

04

Next step

After reviewing video, prepare material, work area, access, equipment and acceptance inputs for an RFQ.

CMG technical resource and equipment selection guide

Evidence boundary

A useful guide is clear about what it does not prove.

CMG uses this resource to organise a project conversation. It does not replace site investigation, geotechnical design, equipment documentation or the project acceptance specification.

  • Do not use video footage as a technical data sheet.
  • Do not copy project outcomes or performance claims from media.
  • Keep video research separate from the final engineering discussion.

Buyer checklist

Prepare these inputs before sending an RFQ.

  1. Product family or model of interest
  2. Application and material condition
  3. Work area and access constraints
  4. Available tow or carrier equipment
  5. Delivery and acceptance requirements

Decision record

Turn the research question into a reviewable equipment brief.

Use the following record as a handover between procurement, site engineering and the equipment supplier. Empty fields are signals to investigate, not assumptions to fill with a generic machine claim.

01

Inputs to evidence

  • Product family or model of interest
  • Application and material condition
  • Work area and access constraints
  • Available tow or carrier equipment
02

Decision to make

  • Product context
  • Application context
  • Evidence boundary
03

Documents to request

  • Source-matched model specification and configuration
  • Operating and maintenance guidance for the quoted scope
  • Project-specific verification and handover requirements

Related equipment

Move from the question to a CMG equipment review.

CMG compaction equipment video centre

Video centre

Use video as context, not as unsupported proof.

Review available CMG equipment footage, then bring your project inputs to the technical discussion.

Visit the CMG video centre

Resource FAQ

Further questions for the project team.

Where is the official CMG video centre?

The official channel is linked from the CMG product, solution and company pages.

Does a video prove site suitability?

No. Suitability depends on the project brief and engineering review.

What should be sent after watching a video?

Material, work area, access, equipment available, programme and acceptance requirements.

Can a video replace product documentation?

No. Model documents and project-specific technical information still need to be confirmed.

Project RFQ

Tell us what the ground needs.

Share the project conditions and the CMG team can discuss a suitable equipment route.